IBPML is currently implementing a 660 MW coal-based thermal power project in the first phase located at Thoothukudi, Tamil Nadu, which is expected to be commissioned by June 2016. The main generating equipment consists of one steam turbine generator and one PC boiler manufactured by Harbin Steam Turbine Company Limited and Harbin Boiler Company Limited, respectively. The turbine generator set is capable of producing power upto 660 MW of power. The project is also equipped with air-cooled condensers which result in efficient water usage.

The estimated fuel requirement is 3.79 million metric tonnes per annum of Domestic Coal at 100.0% PLF and an assumed Gross Calorific Value of 3,360 kcal. We intend on procuring 70.0% of our coal requirement from Domestic Coal linkages and balance 30.0% from imported coal. IBPML, along with others, have signed a long term open access agreement with Power Grid Corporation of India Limited. Pursuant to this agreement, IBPML expects to deliver generated power from this project using 400 KV transmission line to Tuticorin Pooling Power Grid Corporation substation. The phase I area covers approximately 460 acres of land.



IBPML - Phase II, a 660 MW coal-based thermal power project is proposed to be built adjacent to IBPML - Phase I, which is under implementation at Thoothukudi, Tamil Nadu.